Collaboration for project success
Axsys Projects and Stefanutti Stocks' partnership allowed for:



Case Study
Sustainable environmental management solutions for extended mining operations
The Klipspruit Colliery life-of-mine extension required a comprehensive pollution control system to ensure environmental compliance and operational continuity. This R4.3 billion project extended mining operations to 2037 while enhancing water management capabilities and integrating long-term sustainability measures into the process.
The project focused on ensuring extended mine life and integrating enhanced environmental practices for South32. By building these systems, the project set the groundwork for sustainable mining operations that comply with South Africa's environmental regulations and promote regional development.
Axsys Projects and Stefanutti Stocks' partnership allowed for:
The project demanded:
Project Classification: Environmental Infrastructure
Contract Type: Joint Venture - Design and Build
Programme: Voluntary Rebuild Programme (VRP)
The project delivered reliable pollution control dams and stormwater management systems, improving environmental compliance and water management. The infrastructure now ensures sustainable operations for the Klipspruit Colliery, supporting mining activities until 2037.